5.2 Assembly SOP
Preparation before assembly
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, materials as bellow:
1) Working table
2) Philips-head screwdriver
3) Gloves
4) Cleaning cloth
5) ESD protection
6) U3818DW Curve Sponge Jig
Item
1
Picture
Operation
1. Insert "WIRE
24P/24P" into SPS
BD
2. Assemble SPS BD
to Main SHD
3. Insert "FFC EDP"
into I/F BD and
adhere a tape to fix
it
4. Insert "WIRE
24P/24P" into I/F BD
5. Assemble I/F BD to
Main SHD
6. Insert "SPS BD to
LED Driver BD wire"
into LED Driver BD
7. Assemble LED
Driver BD into Main
SHD
8. Lock 10 PCBA
screws
9. Assemble Mylar on
Main SHD to cover
SPS BD
- 16 -
Tool
Notes
Philips-head
Do not
screwdriver
touch the
component
Torsion of PCB
without
screw: 8.5±1Kg
wearing
insulating
gloves
when
disassembli
ng and
assembling
Power BD