5.2 Assembly SOP (P2722Hb)
Preparation before assembly
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, materials as bellow:
1) Working table
2) Philips-head screwdriver
3) Hex-head screwdriver
4) Gloves
5) Cleaning cloth
6) ESD protection
Item
1
2
Picture
Operation
1. Assemble SPS BD in Main
SHD
2. Insert the LVDS cable into I/F
BD
3. Insert SPS BD cable into I/F BD
and then assemble I/F BD into
Main SHD
4. Lock 5 PCB screws and 2 hex
screws
1. Assemble Mylar (Paste Mylar
on Main SHD like the picture
showed)
- 13 -
Tools
Notes
1. Philips-
head
screwdriver
Torsion of
PCB screw:
8.5±1kgf
2. Hex-head
screwdriver
Torsion of
hex screw:
5±0.6Kgf