HDW-xB, HDW-xBN, and HDW-xBR models are built-in units
that require installation into a cabinet before operation.
WARNING
ELECTRIC SHOCK HAZARD: Built-in units must be
installed by a qualified electrician. Installation must
conform to all local electrical codes. Installation by
unqualified personnel will void the unit warranty and may
lead to electric shock or burn, as well as damage to unit
and/or its surroundings.
1. Cut the appropriate opening in the cabinet. Refer to the
"Built-In Cutout Dimensions" chart and illustration below
for dimensions.
NOTE: Maintain a minimum clearance of 25 mm (1") between
the cutout opening and the floor.
Built-In Cutout Dimensions
Width
Model
(A)
HDW-1B
720 mm
(28-3/8 ")
HDW-2B
720 mm
(28-3/8 ")
HDW-3B
720 mm
(28-3/8 ")
HDW-1BN
502 mm
(19-3/4 ")
HDW-2BN
502 mm
(19-3/4 ")
HDW-3BN
502 mm
(19-3/4 ")
HDW-1BR
722 mm
(28-7/16 ")
HDW-2BR
722 mm
(28-7/16 ")
HDW-3BR
722 mm
(28-7/16 ")
2. Fasten a locking strip (not supplied) to the lower front
inside lip of the cabinet opening.
3. Make sure a properly grounded electrical supply of the
correct voltage and size is installed inside the cabinet
cutout. See the SPECIFICATIONS section for details.
HDWCEM1-0822
Depth
Height
(B)
(C)
610 mm
257 mm
(24 ")
(10-1/8 ")
610 mm
514 mm
(24 ")
(20-1/4 ")
610 mm
771 mm
(24 ")
(30-3/8 ")
720 mm
257 mm
(28-3/8 ")
(10-1/8 ")
720 mm
514 mm
(28-3/8 ")
(20-1/4 ")
720 mm
771 mm
(28-3/8 ")
(30-3/8 ")
460 mm
257 mm
(18-1/8 ")
(10-1/8 ")
460 mm
529 mm
(18-1/8 ")
(20-13/16 ")
460 mm
802 mm
(18-1/8 ")
(31-9/16 ")
Front View
A
C
Locking
Strip
25 mm
(1")
3 mm
(1/8")
22 mm
(7/8")
Cutout and Locking Strip Dimensions
4. Partially insert the unit into the opening, making sure the
conduit is fed into the opening first.
5. Have a qualified electrician connect the unit wires from the
conduit to the electrical supply inside the cabinet.
6. Before installing the unit into the opening completely, apply
a bead of National Sanitation Foundation-approved sealant
between the heated drawer flange and the cabinet facing.
7. Slide the unit into the opening until the front locking studs
drop behind the locking strip. To verify installation, pull out
the bottom drawer completely and gently pull to ensure the
unit is locked in place.
Cabinet
Facing
Heated
Drawer
Flange
Built-In Installation (HDW-2B Model shown)
9
INSTALLATION
Side View
B
Locking
Strip
Locking
Strip
Locking Studs
(underneath)