HPE JH323A Installation Manual page 76

Table of Contents

Advertisement

switch configuration environment,
terminal parameters,
SFP+
port,
55
port LED,
60
site
cleanliness,
2
dust concentration,
examining installation site,
gas saturation,
2
humidity,
2
IRF fabric installation site planning,
temperature,
2
stop bits (parameter),
switch
chassis views,
44
connecting console cable,
connecting IRF physical ports,
connecting USB mini console cable,
cooling system,
62
first time access,
grounding,
15
grounding through AC power cord,
grounding with a grounding conductor buried
in the earth ground,
grounding with grounding strip,
identifying IRF master switch,
identifying IRF member switch physical
ports,
35
installation, 1,
6
LEDs,
54
planning IRF cabling scheme, 36,
planning IRF member IDs,
ports,
54
powering on,
31
setting configuration environment,
setting terminal parameters,
setting up IRF fabric,
technical specifications,
verifying installation,
workbench mounting switch,
system administration
troubleshooting configuration terminal
problems,
42
troubleshooting fan failure,
troubleshooting power supply failure,
system status LED,
58
T
technical specifications,
28
31
2
2
34
31
28
38
29
28
18
17
15
34
36
34
28
31
33
44
26
15
40
40
48
10/100/1000 Base-T autosensing Ethernet
port,
55
10/100/1000 Base-T autosensing Ethernet port
LED,
59
console port,
54
fan tray status LED,
interface card,
52
interface card port status LED,
interface card status LED,
LED,
58
management Ethernet port,
management Ethernet port LED,
port,
54
port mode LED,
power supply,
51
power supply input status,
power supply output status,
power supply status LED,
SFP+ port,
55
SFP+ port LED,
system status LED,
USB port,
54
temperature
installation site requirements,
tools needed for installation,
topology
planning IRF cabling scheme, 36,
topology (IRF fabric),
troubleshooting
configuration terminal problems,
fan failure,
40
garbled display,
no display,
42
power supply failure,
U
USB
port,
54
V
verify the IRF fabric setup, 39,
verifying
IRF fabric setup, 39,
switch installation,
VT100,
31
W
workbench
mounting switch,
72
61
61
60
54
60
59
61
61
58
60
58
2
3
36
34
42
43
40
40
40
26
15

Advertisement

Table of Contents
loading

Table of Contents