HPE JH323A Installation Manual page 73

Table of Contents

Advertisement

electromagnetic interference. See
EMI prevention,
3
emulation (parameter),
environment
examining installation site,
site cleanliness,
2
site dust concentration,
site gas saturation,
site humidity,
2
site temperature,
examining installation site,
F
fan
failure (troubleshooting),
fan tray
installation,
41
status LED,
61
fiber
laser safety recommendations,
field replacement unit. See
flow control (parameter),
flowchart of IRF fabric setup,
FRU
compatibility matrixes, 51,
G
garbled display (troubleshooting),
gas (installation site),
grounding
EMI prevention,
3
grounding conductor buried in the earth
ground,
17
grounding strip,
15
switch,
15
switch through AC power cord,
switch with a grounding conductor buried in
the earth ground,
switch with grounding strip,
H
hardware
10/100/1000 Base-T autosensing Ethernet
port LED,
59
10/100/1000 Base-T autosensing Ethernet
port technical specifications,
connecting PSR150-D1(JD366B),
connecting
PSR720-56A(JG544A)/PSR1110-56A(JG545
A)/PSR150-A1(JD362B),
console port technical specifications,
fan tray status LED,
EMI prevention
31
2
2
2
2
2
40
3
FRU
31
33
51
43
2
18
17
15
55
23
24
54
61
grounding switch,
grounding switch through AC power cord,
grounding switch with a grounding conductor
buried in the earth ground,
grounding switch with grounding strip,
interface card installation, 24,
interface card port status LED,
interface card removal,
interface card status LED,
management Ethernet port LED,
management Ethernet port technical
specifications,
54
mounting bracket kit,
port mode LED,
port technical specifications,
power supply,
18
power supply input status,
power supply output status,
power supply removal,
power supply status LED,
PSR150(JD362A, JD362B, JD366A, or JD366B)
power supply installation,
PSR150(JD362A, JD362B, JD366A, or JD366B)
power supply removal,
PSR720-56A/PSR1110-56A (JG544A/JG545A)
power supply installation,
PSR720-56A/PSR1110-56A (JG544A/JG545A)
power supply removal,
SFP+ port LED,
SFP+ port technical specifications,
switch installation, 1,
switch installation in 19-inch rack,
system status LED,
USB port technical specifications,
verifying switch installation,
workbench switch mounting,
humidity (installation site),
I
ID (IRF member),
34
identifying
IRF master switch,
IRF member switch physical ports,
installing
accessories,
4
EMI prevention,
examining installation site,
fan tray,
41
front and rear mounting bracket kit,
front mounting bracket kit,
interface card, 24,
IRF fabric installation site planning,
69
15
17
25
61
26
60
60
8
59
54
61
61
18
58
19
20
20
22
60
55
6
7
58
54
26
15
2
34
35
3
2
12
8
25
34
18
15

Advertisement

Table of Contents
loading

Table of Contents