HPE JH323A Installation Manual page 13

Table of Contents

Advertisement

To install the switch in a 19-inch rack by using the front mounting brackets:
Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded.
1.
Determine the mounting position on the switch for the front mounting brackets.
2.
You can install the front mounting brackets at one of the following positions:
HPE 5130 24G 4SFP+ 1-slot HI and HPE 5130 48G 4SFP+ 1-slot HI switches—Port side,
power supply side, or mid-mounting position.
HPE 5130 24G PoE+ 4SFP+ 1-slot HI and HPE 5130 48G PoE+ 4SFP+ 1-slot HI
switches—Mid-mounting position.
Attach the front mounting brackets to the chassis:
3.
a. Unpack the front mounting brackets and the M4 screws (supplied with the switch) for
attaching the brackets to the switch chassis.
b. Align the round holes in the wide flange of one front mounting bracket with the screw holes
in the chassis.
c. Use M4 screws to attach the mounting bracket to the chassis.
d. Repeat the proceeding two steps to attach the other mounting bracket to the chassis.
Figure 6 Attaching the front mounting bracket to the port side
Figure 7 Attaching the front mounting bracket to the power supply side
9

Advertisement

Table of Contents
loading

Table of Contents