Maintenance; General; Maintenance Instructions - Baxi Ultra Heat 15 User Manual

Condensing central heating boiler
Table of Contents

Advertisement

7

Maintenance

7.1

General

7.2

Maintenance Instructions

7668276-01 (10/16)
1. The boiler does not require any special maintenance.
However, the boiler must be serviced annually in accordance
with the Installation and Service Manual and the relevant
section of the Benchmark Service Record completed in order to
maintain the warranty.
Taking out a maintenance contract is recommended.
CAUTION
Maintenance operations must be performed by a
qualified competent person.
Use only genuine spare parts.
2. The painted panels should be wiped with a damp cloth and
then dried completely. DO NOT USE ABRASIVE CLEANING
AGENTS.
1. The central heating system should be checked regularly.
Proceed as follows:
For Sealed Systems
If the water pressure is lower than 0.7 bar, the water
must be topped up. If necessary: top up the CH system
(recommended water pressure between 1 and 2 bar).
• Check radiators for leaks and (especially in damp areas) for
rust.
• Open and close the radiator valves several times a year to
ensure they can still be rotated.
• Only clean the outside of the boiler with a damp cloth. Do not
use abrasive cleaning agents.
CAUTION
Only a qualified installer may clean the inside of the
boiler.
Maintenance
7
Ultra Heat
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultra heat 12Ultra heat 18Ultra heat 21Ultra heat 24

Table of Contents