Installer Reference Guide At A Glance; About The Box; Overview: About The Box; Outdoor Unit - Daikin Siesta AZQS125B8V1B Installer's Reference Manual

Hide thumbs Also See for Siesta AZQS125B8V1B:
Table of Contents

Advertisement

3 About the box

▪ Installer reference guide:
▪ Preparation of the installation, reference data,...
▪ Format: Digital files on
http://www.daikineurope.com/support-
and-manuals/product-information/
Latest revisions of the supplied documentation may be available on
the regional Daikin website or via your dealer.
The original documentation is written in English. All other languages
are translations.
Technical engineering data
▪ A subset of the latest technical data is available on the regional
Daikin website (publicly accessible).
▪ The full set of latest technical data is available on the Daikin
Business Portal (authentication required).
2.2
Installer reference guide at a
glance
Chapter
General safety
Safety instructions that you must read
precautions
before installing
About the documentation
What documentation exists for the
installer
About the box
How to unpack the units and remove
their accessories
About the units and
▪ How to identify the units
options
▪ Possible combinations of units and
options
Preparation
What to do and know before going
on‑site
Installation
What to do and know to install the
system
Commissioning
What to do and know to commission the
system after it is installed
Hand‑over to the user
What to give and explain to the user
Maintenance and service
How to maintain and service the units
Troubleshooting
What to do in case of problems
Disposal
How to dispose of the system
Technical data
Specifications of the system
Glossary
Definition of terms
3
About the box
3.1

Overview: About the box

This chapter describes what you have to do after the box with the
outdoor unit is delivered on-site.
It contains information about:
▪ Unpacking and handling the unit
▪ Removing the accessories from the unit
Keep the following in mind:
▪ At delivery, the unit MUST be checked for damage. Any damage
MUST be reported immediately to the claims agent of the carrier.
▪ Bring the packed unit as close as possible to its final installation
position to prevent damage during transport.
▪ Prepare the path along which you want to bring the unit inside in
advance.
Installer reference guide
6
Description
3.2

Outdoor unit

3.2.1

To unpack the outdoor unit

1
2
3.2.2

To handle the outdoor unit

CAUTION
To avoid injury, do NOT touch the air inlet or aluminium
fins of the unit.
Carry the unit slowly as shown:
3.2.3
To remove the accessories from the
outdoor unit
2
3
AZQS100~140B8V1B + AZQS100~140B7Y1B
a
b
c
d
e
ENERG
Y
IJA
ENERG
Y
IJA
IE
IA
IE
IA
Split system air conditioners
4P385529-1C – 2019.04

Advertisement

Table of Contents
loading

Table of Contents