36
21. Is the air supply filtered and dried as per specification? (See Air Supply on
page 15.).
Yes
No
Comments:
22. Are the voice and data telephone lines installed?
Yes
No
Comments:
23. What type of network connection is used?
24. What are the three consecutive TCP/IP addresses that are to be used for the
MCE and RAS connection? (See Network on page 20.)
1.
2.
3.
Follow Up
Is follow-up required?
No
The location described in this document meets all criteria for a
timely and successful installation of the ThermoFlex Wide II device.
Yes
Some follow-up is required to ensure that the site requirements are
met prior to the installation of the device.
The outstanding items from the Site Requirements list are:
Appendix B: Site Inspection Checklist
Prefilter ordered
Modem number: