Kodak ThermoFlex Wide II Site Preparation Manual page 38

Output device
Table of Contents

Advertisement

34
12. C the room's humidity control system handle the moisture load generated by
the processor line?
Yes
No
Comments:
13. Is the installation area flat to the required specification? (See Floors on page 11.)
Yes
No
Comments:
14. Does the floor meet the maximum peak loading specification? (See Floors on
page 11.)
Yes
No
Comments:
15. Is there large machinery or a forklift throughway inside the site, or any traffic or
industry near the site that may transmit vibration to the device? (See Floor
Vibration on page 12.)
Yes
No
Comments:
Appendix B: Site Inspection Checklist

Advertisement

Table of Contents
loading

Table of Contents