Benchmark Alpha E-Tec Plus 28 Installation And Servicing Instruction page 39

Wall mounted, fan assisted, room sealed, gas fired, high efficiency condensing combination boiler
Table of Contents

Advertisement

Control panel - Fig. 7.3
6.
Press the hooks on the side of the control panel (G).
7.
Tilt the control panel (G) towards you.
Side panels - Fig. 7.4
8.
Remove the screws 'H' securing the side panel 'I'. Lift
the side panel and pull it forwards unhooking it from
the rear panel (view 'A' in Fig. 7.4) Lower the panel
out and away from the top cover.
Note: The side panels require no sealing strip as the front
case insulation forms the room seal.
8
A
H
A
8
I
H
Alpha E-Tec Plus 28, 33 and 38 - Routine Servicing
6
7
G
6
Fig. 7.3
Fig. 7.4
6
G
6
View A
A
A
8
H
A
A
8
I
H
39

Advertisement

Table of Contents
loading

Table of Contents