Section 7
Testing functionality
Means to indicate, measure and record operation and times, for example an event
recording facility
A bi-stable relay (BR) or two auxiliary relays to simulate a CB
Two push-buttons (SC, ST) to operate the BR and a change-over switch (SRY) to simulate
CBREADY
Possibly a switch simulation the synchronizing check SESRSYN condition
IED
SMBRREC - CLOSECB
Trip
SMBRREC - CBPOS
SMBRREC - CBREADY
EN09000206 V1 EN-US
Figure 24: Simulating the CB operation by a bi-stable relay/breaker simulator and
7.8.2.1

Preparation of the verification

1.
Check the function settings on the local HMI under Main menu/Settings/IED Settings/
Control/SMBRREC(79,0->1)/SMBRREC:1
If any timer settings are reduced to speed up or facilitate the testing, they shall be set to
normal after testing. A temporary label on the IED can be a reminder to restore normal
settings after which a verification test should be performed.
2.
Decide if a synchronizing check function SESRSYN shall be included in the test.
If SESRSYN as an internal function or external device is not operated by the injection,
input signal SYNC must be connected as a permanent high signal or controlled by a
switch.
3.
Read and make notes of the reclosing operation counters on the local HMI under Main
menu/Tests/Function status/Control/SMBRREC(79,0->1)/SMBRREC:1
Possibly reset the counters to
4.
Make arrangements for the simulation of the CB, for example as in figure 24.
5.
Make arrangements for indication, recording and time measurements.
The signals for CBPOS, START, CLOSECB, READY and other relevant signals should
preferably be arranged for event recording with time tagging. If that is not possible,
other means of time measurement and recording should be arranged.
7.8.2.2

Switching the autorecloser for 3-phase operation function to

1.
Set the
2.
Set the
102
manual switches
Zero . Counters are reset in the reset menu.
Operation setting to Off and check the state.
Operation setting to On and check the state, including SETON and READY.
© Copyright 2013 ABB. All rights reserved
BR
SC
ST
SRY
To test
set
+
-
IEC09000206_1_en.vsd
1MRK 506 336-UEN B
M12400-40 v6
On and Off
M12400-79 v5
Line distance protection REL650
Commissioning manual