enphase IQ System Controller 3 INT Quick Install Manual page 34

Hide thumbs Also See for IQ System Controller 3 INT:
Table of Contents

Advertisement

Steps to activate System Shutdown
1.
Turn the SSD switch to the "OFF" position.
2.
Press the DC switches on all IQ Battery 5P units to turn them
"OFF"
3.
Turn the PV breakers in the IQ System Controller 3 INT to "OFF"
position.
4.
Turn the IQ Battery 5P breakers in IQ System Controller 3 INT to
"OFF" position.
SSD header-switch wiring sequence:
S S D H E A D E R P I N
Pin-1
Pin-2
Pin-3
Pin-4
IQ System Controller 3 INT Quick Install Guide
S S D S W I TC H T E R M I N A L
Terminal-1
Terminal-5
Terminal-6
Terminal-2
Steps to de-activate System Shutdown
1.
Turn the SSD switch to the "ON" position.
2.
Turn the PV breakers in the IQ System Controller 3 INT to "ON"
position.
3.
Turn the IQ Battery 5P breakers in IQ System Controller 3 INT to
"ON" position.
4.
Press the DC switch on all IQ Battery 5P units to turn them
"ON"
34

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IQ System Controller 3 INT and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Sc100g-m230row

Table of Contents