Tools; Parts List; Ap-2 Autopumps; Bottom-Loading Ap-2/Bl - QED AutoPump AP-2 Operation Manual

Controllerless system
Table of Contents

Advertisement

AP-2 Manual
5. Pump support system:
Well cap
Polypropylene support rope with quick-link assembly or SS wire rope

Tools

The following tools are used to service the AP-2:
• Spanner wrench
• 3/32-inch Hex (Allen) key
• 6-inch Cresent wrench

Parts List

In aggressive sites over millions of cycles, the parts that one may anticipate replacing are:
• Discharge check valve ball

AP-2 AutoPumps

In both the Bottom-Loading and the Top-Loading models, the fluid is pushed out of the pump
through a check valve located at the top of the pump. This check valve prevents the fluid
from reentering the pump.

Bottom-Loading AP-2/BL

The Bottom-Loading AutoPump fills through a check valve at the bottom of the pump.
There are two lengths of AP-2/BL: long and short. The fluid level in the well can be
drawn down to 35 inches from the bottom of the long BL, and 20 inches from the bottom
of the short BL (See Figure 3)

Top-Loading AP-2/TL

The Top-Loading AutoPump fills through a check valve at the top of the pump, therefore
the fluid level in the well will never go below the level of this check valve. There are two
lengths of AP-2/TL: long and short (See Figure 4)
Revision 7 - August, 2007
Chapter 3: Equipment
Page 13

Advertisement

Table of Contents
loading

Table of Contents