Switching On - Siemens SIMOTICS DC 1GG7 Operating Instructions Manual

Table of Contents

Advertisement

Checklists
D.1 Switching on
D.1

Switching on

Table D-1
Items to check during switch-on
Items to check during switch-on
Machine started without load for a short period "Start motor"
Direction of rotation checked
When running down from mechanical operation, noises and vibrations at the bear‐
ings and bearing shields checked.
Machine started again and run up to maximum permissible speed - smooth running
checked
With machine running satisfactorily, cooling system switched on
Machine monitored for a while in idling operation
With satisfactory idling performance, load connected to machine
Smooth running checked
Values for voltage, current and output logged
As far as possible, the corresponding values for the working machine are logged.
Temperatures of the bearings, windings, etc., monitored and logged until the sys‐
tem reaches a steady state.
Operating time reduced accordingly if the water-to-water cooler (if installed) is not
operated at this "preliminary" dry run stage.
Note:
Date
126
Name
O.K.
Comment
Signature
SIMOTICS DC 1GG7
Operating Instructions 02/2016

Advertisement

Table of Contents
loading

Table of Contents