Oneida Air Systems Dust Deputy 2.5 D.I.Y. Manual page 7

Cyclone separator
Table of Contents

Advertisement

Assembly Instructions
For the 2.5 D.I.Y (#AXD251004), continue to Step 4.
3
Turn Cyclone (A) upside-down. Place Gasket (B) on the base
of Cyclone and align all the holes. Place the topside of the
Lid (E) against Gasket and align all holes. Secure Cyclone,
Gasket and Lid together using six Bolts (C1), six Washers
(C2), and six Whiz-Lock Nuts (C3) as shown in [FIG. 3].
Note: Tighten hardware evenly to eliminate air leaks. DO
NOT OVERTIGHTEN! On the underside of Lid (E) are hex-
shaped recesses for easier installation of the nuts. Place hex
side of the Whiz-Lock Nut (C3) into recess.
C3
E
B
C2
C1
FIG. 3
oneida-air.com
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dust deputy 2.5 plusAxd251004Axd250504

Table of Contents