Installation Site; Installation; Standard Installation - STIEBEL ELTRON DHB-E 13 AU Operation And Installation Manual

Electronically controlled instantaneous water heater
Hide thumbs Also See for DHB-E 13 AU:
Table of Contents

Advertisement

INSTALLATION

Installation
9.1

Installation site

Material losses
!
Only install the appliance in rooms free from the risk of
frost.
f Always install the appliance vertically near the draw-off
f
point.
The appliance is suitable for undersink and oversink installations.
Note
Mount the appliance on a sufficiently load-bearing wall.
Undersink installation
1 Cold water inlet
2 DHW outlet
Oversink installation
2
1 Cold water inlet
2 DHW outlet
www.stiebel-eltron.com
1
2
1
10. Installation

10.1 Standard installation

- Electrical connection in the lower section of the appliance for
installation on unfinished walls
- Water connection for installation on finished walls
For further installation options, see chapter "Installation options".
f Open the appliance.
f
f Remove the back panel by pressing the two locking hooks
f
and pulling the lower part of the back panel forwards.
f Mount the wall mounting bracket.
f
Align the installation template based on the existing electrical
connection when marking out the drill holes (wall mounting and
lower back panel).
If you want to adapt the existing water connections, take the di-
mensions from the drawing when marking out the drill holes; see
chapter "Specification/ Dimensions and connections". In this case,
check beforehand that the electrical connection lies within one of
the areas marked on the installation template.
DHB-E AU|
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dhb-e 18 auDhb-e 27 au

Table of Contents