STIEBEL ELTRON DHB-E 13 AU Operation And Installation Manual page 8

Electronically controlled instantaneous water heater
Hide thumbs Also See for DHB-E 13 AU:
Table of Contents

Advertisement

INSTALLATION
Installation
160
30
1 Installation aid
f Prepare the power cable.
f
Preparing the water connection
Material losses
!
Carry out all water connection and installation work in
accordance with regulations.
f Remove the caps from the tees.
f
f Fit the plugs and the extensions with gaskets.
f
f Fit the strainer in the tee for the cold water inlet.
f
Damage to the appliance and environment
!
The strainer must be fitted for the appliance to function.
f When replacing the appliance, check that the strain-
f
er is present.
2
1
1 Flow limiter
2 Plastic profile washer
f Fit the flow limiter or plastic profile washer.
f
8
| DHB-E AU
1
Installing the appliance
f For easy installation, push the cable grommet of the upper
f
electrical connection into the back panel from behind.
f Remove the transport plugs from the water connections.
f
f Remove the fixing toggle from the upper part of the back
f
panel.
f Route the power cable through the cable grommet from be-
f
hind, until the power cable rests against the cable sheath.
Align the power cable.
If the cross-section is > 6 mm², enlarge the hole in the cable
grommet.
f Press the appliance over the threaded stud of the wall
f
mounting bracket. When doing so, push through the soft
seal in the back panel of the appliance. If necessary, use a
screwdriver.
f Push the fixing toggle on to the threaded stud of the wall
f
mounting bracket.
f Push the back panel of the appliance on to the wall. Turn the
f
fixing toggle 90° clockwise to lock the appliance in place.
Note
f Install the flow limiter.
f
f With low water pressure.The pressure drop can be
f
reduced by replacing the flow limiter with the plastic
profile washer provided.
www.stiebel-eltron.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dhb-e 18 auDhb-e 27 au

Table of Contents