About The Product - Daikin Altherma EHYHBH05A Series Installer's Reference Manual

Hybrid heat pump
Table of Contents

Advertisement

1
|

About the product

1 About the product
Installer reference guide
6
Especially for UK:
The Benchmark Scheme
Benchmark places responsibilities on both manufacturers and installers. The
purpose is to ensure that customers are provided with the correct equipment for
their needs, that it is installed, commissioned and serviced in accordance with the
manufacturer's instructions by competent persons and that it meets the
requirements of the appropriate Building Regulations. The Benchmark Checklist
can be used to demonstrate compliance with Building Regulations and should be
provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work
in accordance with the Benchmark Code of Practice which is available from the
Heating and Hotwater Industry Council who manage and promote the Scheme.
Visit
http://www.centralheating.co.uk
Approvals
British Gas Service listing:
EHYKOMB33AA*: G.C.N. 47-464-01
The product (hybrid system) is composed of two modules:
heat pump module,
gas boiler module.
These modules MUST always be installed and used together.
a
a Heat pump module
b Gas boiler module
for more information.
b
EVLQ05+08CA + EHYHBH05A + EHYHBH/X08A + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1G – 2022.09

Advertisement

Table of Contents
loading

Table of Contents