Start-Up After A Long Stop; Disposal Requirements - Daikin FDBQ25B5V1 Operation Manual

Split and multi system room air conditioners
Table of Contents

Advertisement

Start-up after a long stop

Confirm the following:
-
Check that the air inlet and outlet are not blocked.
Remove any obstacle.
-
Check if the earth is connected.
Clean the air filter and outside panels.
-
After cleaning the air filter, make sure to attach it.
Turn on the main power supply switch.
-
The control panel display lights when the power is turned on.
-
To protect the unit, turn on the main power switch at least
6 hours before operation.

Disposal requirements

Dismantling of the unit, treatment of the refrigerant, of oil and of other
parts must be done in accordance with relevant local and national
legislation.
Your air conditioning product is marked with this symbol.
This means that electrical and electronic products shall
not be mixed with unsorted household waste.
Do not try to dismantle the system yourself: the dismantling of the air
conditioning system, treatment of the refrigerant, of oil and of other
parts must be done by a qualified installer in accordance with
relevant local and national legislation.
Air conditioners must be treated at a specialized treatment facility for
re-use, recycling and recovery. By ensuring this product is disposed
of correctly, you will help to prevent potential negative consequences
for the environment and human health. Please contact the installer or
local authority for more information.
Batteries must be removed from the remote controller and disposed
of separately in accordance with relevant local and national
legislation.
Operation manual
4
N
OTES
FDBQ25B5V1
Split series room air conditioners
Multi system room air conditioners
3P468514-4

Advertisement

Table of Contents
loading

Table of Contents