Location Considerations; Installation; Leveling; Ductwork Installation - Aprilaire E070 Installation Instructions Manual

Hide thumbs Also See for E070:
Table of Contents

Advertisement

LOCATION CONSIDERATIONS

• Allow sufficient clearance for filter removal and
to prevent airflow obstruction
• Electrical service access will require the removal
of the side panel shown . Allow sufficient space
for service on this side of the unit .

INSTALLATION

LEVELING

The feet can be adjusted to level the unit, and
if required, to accommodate drain fittings and a
secondary condensate pan . Leveling is required
to ensure proper drainage from the dehumidifier .
See Figure 4 .

DUCTWORK INSTALLATION

Adding 5-10 feet of insulated ductwork to the inlet and outlet of the dehumidifier will ensure dehumidified air is circulated throughout the crawl
space and will reduce the noise level of the dehumidifier . Point the inlet and outlet ducts in opposite directions to minimize recirculation of
dehumidified air .
• Maximum recommended total duct length is 100 feet .
• To avoid pulling in dirt and other particles, do not lay intake duct on the floor of the crawl space .
NOTE: This dehumidifier is designed for crawl space and stand-alone applications only . Do not duct to HVAC system .
FIGURE 3 – Filter Access Clearance
ELECTRICAL
SERVICE ACCESS
THIS SIDE
8 FT. POWER CORD
90-2304
FIGURE 4 – Level the Unit
0.38" MIN
2.00" MAX
FILTER
TOP VIEW
3/4" FNPT DRAIN
13"
MINIMUM
CLEARANCE
FOR FILTER
6"
MINIMUM
CLEARANCE
FOR PROPER
AIR FLOW
90-2305
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents