Location Considerations; Leveling - Aprilaire E100C Installation And Operating Manual

Hide thumbs Also See for E100C:
Table of Contents

Advertisement

LOCATION CONSIDERATIONS

• Allow sufficient clearance for filter removal and to
prevent airflow obstruction
• Electrical service access will require the removal
of the side panel shown� Allow sufficient space
for service on this side of the unit�
• Always install the dehumidifier in a condensate
pan when locating in, or over a finished space�
Adhere to local codes regarding draining of the
condensate pan�

LEVELING

A level surface is required to ensure proper drainage from the dehumidifier� Refer to top mounted bubble level and adjust position until bubble is
within the outer circle�
FIGURE 2 – FILTER ACCESS CLEARANCE
ELECTRICAL SERVICE
ACCESS THIS SIDE
6 FT. POWER CORD
FILTER
TOP VIEW
6" MINIMUM CLEARANCE
FOR PROPER AIR FLOW
15"
MINIMUM
CLEARANCE FOR FILTER
(EITHER SIDE)
90-1840
English 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents