ABB FV4000-VT4 Operating Instruction page 4

Vortex flowmeter / swirl flowmeter
Table of Contents

Advertisement

Contents
4.4
Installation at high media temperatures > 150°C (302 F) ............................................................................29
4.5
Installation for pressure and temperature measurement .............................................................................29
4.6
Installation of final controlling equipment .....................................................................................................30
4.6.1
Vortex flowmeter ...................................................................................................................................30
4.6.2
Vortex and Swirl flowmeters..................................................................................................................30
4.7
Mounting the meter tube ..............................................................................................................................31
4.8
Centering the wafer design ..........................................................................................................................32
4.9
Flowmeter insulation ....................................................................................................................................33
4.10
Transmitter orientation .................................................................................................................................34
4.11
Rotating the display......................................................................................................................................35
4.12
Flowmeter sizes, flow range.........................................................................................................................36
4.12.1
Flow ranges, FV4000 vortex flowmeter ................................................................................................36
4.12.2
Flow ranges, swirl flowmeter FS4000 ...................................................................................................37
5
Electrical connection ........................................................................................................................................38
5.1
Cable connection area .................................................................................................................................39
5.1.1
HART design.........................................................................................................................................39
5.1.2
Fieldbus design .....................................................................................................................................41
5.2
Cable connection..........................................................................................................................................42
5.2.1
Standard design, HART ........................................................................................................................42
5.2.2
Connection via flameproof cable gland (Ex d design) ..........................................................................42
5.2.3
Standard design, PROFIBUS PA / FOUNDATION Fieldbus ................................................................45
5.2.4
Separate design ....................................................................................................................................47
5.3
M12 plug-in connector, PROFIBUS PA .......................................................................................................50
5.4
Switching output ...........................................................................................................................................51
5.5
Configuration of the switching output ...........................................................................................................52
5.6
Functional ground/Equipotential bonding.....................................................................................................54
6
Commissioning..................................................................................................................................................55
6.1
Preliminary checks prior to start-up..............................................................................................................55
6.2
Commissioning the unit ................................................................................................................................55
6.2.1
Switching on the supply power .............................................................................................................55
6.2.2
Device configuration..............................................................................................................................55
6.3
Information on voltage/current consumption ................................................................................................55
6.4
Setting the bus address (PROFIBUS PA)....................................................................................................56
6.5
Setting the bus address (FOUNDATION Fieldbus) .....................................................................................57
6.6
Checking the parameters .............................................................................................................................58
7
Communication .................................................................................................................................................59
7.1
HART protocol communication ....................................................................................................................59
7.2
PROFIBUS PA communication....................................................................................................................61
7.3
FOUNDATION Fieldbus communication......................................................................................................64
7.4
Software history............................................................................................................................................67
4
FV4000-VT4/VR4 / FS4000-ST4/SR4
D184B097U02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fv4000-vr4Fs4000-st4Fs4000-sr4

Table of Contents