Installation
3.5

Wall mounting frame assembly

B Take the wall mounting frame out of the package and
screw together with 6 screws as shown in fig. 7. Use
the inner lugs on the top and bottom horizontal sec-
tions.
Fig. 7
B Hold the wall-mounting frame against the wall ensur-
ing that it is vertical.
B Mark the holes for the wall mounting frame onto the
wall, drill and plug the holes and fix the wall mounting
frame to the wall with the screws provided.
B Mark the position of the flue duct hole if a rear flue is
to be used. Refer to fig. 1 and 16.
Fig. 8
14
B Screw the pre-plumbing manifold with two screws to
the wall mounting frame.
Fig. 9
3.6
6 720 610 576-04.1O
Fig. 10 Manifold
43
47
112
171
172
B A drain tap should be fitted at the lowest point of the
central heating system.
B WRAS approved filling loop must be fitted.
6 720 610 576-05.1O

Pre-piping the system

200
171
112
43
50
120-130
260
CH flow
CH return
Gas cock
Domestic hot water
Cold water inlet
6 720 610 576-11.1O
172
47
35
6 720 610 576-06.1O
6 720 611 451 GB (03.11)