Continental Girbau CG115-25 III Installation Manual page 41

Phase 7 with s.a.f.e. and dual timer
Table of Contents

Advertisement

6. Steam Damper Air Piston (Air Control) Operation Adjustment
Although the damper operation was tested and adjusted prior to shipping at 80 PSI (5.51 bar), steam
damper operation must be checked before the dryer is put into operation. Refer to page 36 for instructions
to check system damper operation. If damper air adjustment is necessary, locate the flow control valve
and make the necessary adjustments as noted below.
37

Advertisement

Table of Contents
loading

Table of Contents