Checking The Product For Leak-Tightness; Decommissioning The Product; Customer Service - Glow-worm EASICOM 3 28c Installation And Maintenance Instructions Manual

Hide thumbs Also See for EASICOM 3 28c:
Table of Contents

Advertisement

12.6.8 Replacing the PCB for the user interface
A
1.
Open the electronics box.
2.
Pull the plug out of the PCB.
3.
Undo the clips on the PCB.
4.
Remove the PCB.
5.
Install the new PCB in such a way that it clicks into the
groove at the bottom and into the clip at the top.
6.
Plug in the PCB plug.
7.
Close the electronics box.
12.6.9 Replacing the expansion relief valve
1
1.
Remove the clip (2).
2.
Remove the expansion relief valve.
3.
Fit the new expansion relief valve with a new O-ring.
4.
Reattach the clip (2).
0020239562_02 EASICOM 3 Installation and maintenance instructions
D
C
C
B
A
2

Decommissioning the product 13

12.6.10 Replacing the volume flow sensor
B
1.
Pull out the plug.
2.
Remove the volume flow sensor (1).
3.
Install the new volume flow sensor.
4.
Plug in the plug.
12.6.11 Replace the pressure sensor
1
2
1.
Pull out the plug.
2.
Remove the clip (1).
3.
Remove the pressure sensor (2).
4.
Install the new pressure sensor.
5.
Reattach the clip (1).
12.7

Checking the product for leak-tightness

Check that the product is leak-tight. (→ Page 21)
13 Decommissioning the product
Decommission the product.
Disconnect the product from the power mains.
Close the gas isolator cock.
Close the cold water stop cock.
Drain the product. (→ Page 26)

14 Customer service

For contact details for our customer service department, you
can write to the address that is provided on the back page,
or you can visit www.glow-worm.co.uk.
A
1
29

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EASICOM 3 28c and is the answer not in the manual?

Questions and answers

John Large
January 19, 2025

can you a supupumpmantery

This manual is also suitable for:

Easicom 3 24c

Table of Contents

Save PDF