Chengdu Ebyte Electronic Technology Co., Ltd.
E18-DTU Series User Manual
(3) The new node device is successfully configured and connected to the network. Click "read Param" and check
that the "Net State" is "connect", indicating that the terminal node device has joined the coordinator device
network.
(4) On the host computer interface of the coordinator device, click "Refresh", you can see that new devices have
entered the network, and click "device join list", and new device information is also available.
Copyright © 2012–20 23 , Chengdu Ebyte Electronic Technology Co., Ltd.
21