Unpack and Verify Cisco NCS 1010

• Field replaceable modules such as PSUs, controller, fan trays, air filter, and line card (the variant of line
• AC and DC power cables that you have ordered. See
Unpack and Verify Cisco NCS 1010
Use this task to unpack and check if all the chassis modules that are required for installation have been shipped.

Procedure

Step 1
When you receive Cisco NCS 1010 equipment at the installation site, open the top of the box.
Step 2
Remove the accessory kits and foam inserts in the box. The box contains Cisco NCS 1010 and other items
that are needed for installation.
Step 3
To remove the chassis from the packaging, grasp the side of the chassis and lift it out of the box.
Use these lifting guidelines to avoid injury to yourself or damage to the equipment:
• Do not lift equipment alone; have another person help you to lift the equipment.
Prepare to Install Cisco NCS 1010
2

Accessory Kit

NCS1010-23-KIT
NCS1010-ETSI-KIT
card that you have ordered).
Prepare to Install Cisco NCS 1010
Contents
This kit has the following items for chassis
installation on an ANSI 23" rack:
• 23" rack to 19" rack adapter
• 12–24 Screws (14x)
This kit has the following items for chassis
installation on an ETSI rack:
• ETSI rack to 19" rack adapter
• M6 screws (8x)
• Ground adapter
Supported
Cables.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NCS 1010 and is the answer not in the manual?

Questions and answers

Table of Contents