Table Of Contents - Bertazzoni REF18FCBIPRV Installation Manual

Hide thumbs Also See for REF18FCBIPRV:
Table of Contents

Advertisement

Available languages

Available languages

CONTENTS
1. IMPORTANT INFORMATION ........................................................................................................................... 5
1.1 Symbols and Their Meanings ............................................................................................................................................. 5
1.2 Disposing of the packing materials .................................................................................................................................. 5
1.3 Climate class ............................................................................................................................................................................ 6
1.4 Food Load Bearing Capacity of the Doors ....................................................................................................................... 6
2. BEFORE INSTALLATION ................................................................................................................................. 7
2.1 Installation location ................................................................................................................................................................ 7
2.2 Cabinetry ................................................................................................................................................................................... 8
2.3 Ventilation ................................................................................................................................................................................. 8
2.4 Electrical Connection ............................................................................................................................................................. 8
2.5 Water Connection (where applicable) ...............................................................................................................................................8
2.6 Tool List ..................................................................................................................................................................................... 8
2.7 Alternatives for Installation ................................................................................................................................................. 9
2.8 Preparation for Installation ................................................................................................................................................. 9
2.9 Location of the Electrical Wiring ......................................................................................................................................10
2.10 Location of the Water System ........................................................................................................................................11
2.11 Product dimensions ..........................................................................................................................................................12
2.12 Unpacking .............................................................................................................................................................................17
2.13 Removing the Connectors on the Side Wall of the Unit ..........................................................................................18
2.14 Removing the Installation Hardware ...........................................................................................................................19
2.15 Removing the vent hole assembly ................................................................................................................................20
3. INSTALLATION INSTRUCTIONS ................................................................................................................... 21
3.1 Before Installation ................................................................................................................................................................21
3.2 Mounting the Anti-Tip Brackets ........................................................................................................................................21
3.3 Preparing the Water Hose and the Electrical Connection ........................................................................................24
3.4 Installation in the cabinet ...................................................................................................................................................24
3.5 Overlay Panel Installation and Preparation ..................................................................................................................31
3.6 Hinge Adjustment and Reversing the Door Swing .....................................................................................................43
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ref18fcbiplvRef24fcbipnvRef24rcbpnvRef30rcbpnv

Table of Contents