Project EV EVD-20S-P User Manual page 7

20kw dc charging
Table of Contents

Advertisement

4. Using a suitable cable, we suggest you use a 5-core cable(with CPC included). For
your convenience, a cable gland is provided. Unlock the unit, and open the door.
Connect the cables into the terminal block, through the cable gland on the bottom
right-hand side and secure them. (If hard wiring your internet connection, connect
the network cable through the second cable gland to the RJ45 socket and tighten
glads accordingly). Ensure all internal wiring is secure and correct, and all breaker
positions are on, then close and lock the unit. The wiring is now complete.
Terminal
Installation and Wiring
1.
Final connections should only be undertaken by skilled persons. Connect the
cables in the correct sequence according to the markings on the terminal block.
2.
The CPC must be connected to the Earth terminal securely.
L1
L2
L3
N
CPC
7