Advertisement

Quick Links

20KW DC Charging
User Guide
Model:
EVD-20S-P
Please read this manual carefully prior
to your use of your EV Charger.

Advertisement

Table of Contents
loading

Summary of Contents for Project EV EVD-20S-P

  • Page 1 20KW DC Charging User Guide Model: EVD-20S-P Please read this manual carefully prior to your use of your EV Charger.
  • Page 2: Copyright Notice

    Thank you for choosing Project EV Charging Equipment Project EV/ATESS EVD series intelligent DC charging equipment is a device that provides high-efficiency, safe and stable DC power supply for electric vehicles, which has a friendly man-machine interface and integrates corresponding functions of control, billing, communication and security protection.
  • Page 3: Table Of Contents

    Contents Copyright Notice ............................Product Description ..........................Packaging List ............................Installation and Wiring .......................... Operation Instruction and LCD Introduction ................LCD Interface Introduction ......................... Fault Codes ..............................Electric Diagram ............................Warranty ................................ Contact Us ..............................
  • Page 4: Product Description

    Product Description 6. Mounting Bracket Air Intake Screen 7. WIFI/4G Antenna RFID Reader 8. Emergency Stop Button Lead Holder 9. Start or Stop Button LED Indicators Explanation of LED Indicators Blue - Standby (The charging equipment can only be used when the blue light is lit) Red - Steady on/flashing (Fault) Green - Steady on...
  • Page 5: Packaging List

    Packaging List Packaging List Item Quantity Remark Mode Charging Equipment User Manual Certificate of Quality Mounting Bracket Already installed on the rear side of the charging equipment Cable Holder Hex Head expansion bolt, M8*80/304 stainless steel Installation and Wiring Installation and Wiring 1.
  • Page 6 2. Loosen the two screws at the bottom of the charging equipment that fixes the mounting bracket. Keep them safe for later use. Bolt the mounting bracket onto the wall using the fixings provided. Mount the holder using the same procedure. Bracket Mounting Hole...
  • Page 7 4. Using a suitable cable, we suggest you use a 5-core cable(with CPC included). For your convenience, a cable gland is provided. Unlock the unit, and open the door. Connect the cables into the terminal block, through the cable gland on the bottom right-hand side and secure them.
  • Page 8: Operation Instruction And Lcd Introduction

    Operation Instruction and LCD Introduction Charging mode and operation APP/RFID Mode: Start or stop charging by scanning QR code using the APP or by swiping the RFID card. You can also use the APP for reservation and payment, provided that the back-office server supports that function.
  • Page 9: Lcd Interface Introduction

    Plug and Charge Mode: To start charging press the silver button on the side of the unit, once the car has been plugged into the charger. The charge will then start. If you want to stop the charging, press the silver button on the side of the charger. Plug &...
  • Page 10 Charging information, which will show the status of the charging equipment, such as standby, charging and fault. Customer card account number and balance.
  • Page 11: Fault Codes

    Fault Codes The table below outlines the type of faults which may appear on your EV charger. Fault Description Emergency stop is activated Over temperature fault Power module communication fault Meter communication fault DC output overvoltage fault DC output overcurrent fault Waiting for BMS communication timeout Insulation detection timeout Insulation detection fault...
  • Page 12 Charger Specification Model EVD-20S-P Dimension (mm) 840*565*410 (WD*H) Weight (KG) 50KG Display Casing Material Stainless steel & acrylic sheet AC Input Grid Connection 400V, 3 phase Voltage AC 320~485V Current Frequency 47~63Hz DC Output Plug Type Voltage DC150~1000V Current 0-50A Voltage-stabalizing Accuracy 0.5%...
  • Page 13: Electric Diagram

    Electric Diagram L2 L3 N...
  • Page 14: Warranty

    (These warranty terms are only applicable to UK consumers only for the ATESS EV chargers, bought through the authorized repair and installation partner) Welcome to Project EV and ATESS, and thanks for choosing our Electric Vehicle charge point. All our products are backed by a 5-year warranty (3-years parts and labour plus 2 years parts) giving you years of trouble-free charging.
  • Page 15 1. Warranted Products This 5 Year limited warranty shall only apply to EV Chargers AC/DC only installation up to 300kW installed and provided by an Authorized 5 Year Warranty Installer. 2. 5 Year Limited Warranty A. 5 years Limited Product Warranty ATESS warrants its EV chargers, known as ‘ATESS Products’...
  • Page 16 3. Exclusions and Limitations The aforementioned “Limited Warranty” does not apply to any ATESS Products which have been subjected to: A. If the direct customers who has obtained the ATESS Products from ATESS or its distributor failed to pay the ATESS Products according to the purchase price, ATESS is entitled to reject the claim under this warranty based on this provision.
  • Page 17 B. The direct customer shall notify the warranty claims to Authorized 5 Year Warranty Installer or its Distributor within 1 week via email only after becoming aware of the circumstances which constitute a warranty case. The report shall include the following information: 1.
  • Page 18: Contact Us

    EV charger spare parts and service costs are assessed each year, subject to the latest prices. ATESS reserves the right to interpret other unmentioned matters. 4|Page 9. Contact In the first instance please contact your installer or failing this please contact Project EV https://www.projectev.co.uk/...
  • Page 19 Contact Information Company Name: Project EV Company Address: Unit 1 Lakes Court, Lancaster Business Park, Newborough Road, Needwood, Burton Upon Trent, Staffordshire, DE13 9PD Website: www.projectev.co.uk Contact Number: 0800 599 9582 General Enquiries Email: enquiries@projectev.co.uk Pro App Email: proapp@projectev.co.uk...
  • Page 20 This user manual is correct as of 02/2023...

Table of Contents