Download Print this page

Advertisement

Quick Links

TIG/INS65
TIGER
PETHOUSE
& RUN
GENERAL ASSEMBLY
INSTRUCTIONS

Advertisement

loading

Summary of Contents for Tiger PETHOUSE & RUN

  • Page 1 TIG/INS65 TIGER PETHOUSE & RUN GENERAL ASSEMBLY INSTRUCTIONS...
  • Page 2: Before You Get Started

    BEFORE YOU GET STARTED PLEASE READ INSTRUCTIONS CAREFULLY • Check the pack and make sure you have all the parts listed. • When you are ready to start, make sure you have the right tools at hand (not supplied). • Ensure there is plenty of space and a clean dry area for assembly. TIMBER As with all natural materials, timber can be affected during various weather conditions.
  • Page 3 Please retain instructions for future reference CAUTION: CAUTION: All buildings should be erected It is advisable to wear gloves by two competent adults. during building installation. MADE IN THE UK SINCE 1913. We have been making our high quality, great value garden buildings here in Britain for decades.
  • Page 4 BEFORE YOU GET STARTED - PRE ASSEMBLY TOOLS REQUIRED: We recommend using the following tools (not supplied): HAMMER RUBBER MALLET LADDER TAPE MEASURE SHARP KNIFE SPIRIT LEVEL SCREWDRIVER + WOOD SAW SPANNER FIXING KIT GUIDES: FX02 - NAIL KITS SMALL FX03 - NAIL KITS MEDIUM For Shed Products Up To 6ft Sides: For Shed Products With 7ft to 9ft Sides:...
  • Page 5 Please retain instructions for future reference BUILDING PACK CONTENTS: For full details of what should be included please see the itemised packing list that is supplied with the delivery. They are also available on request in pdf form from our helpful Customer Support team – please call: 0113 205 4189 or use the “Items Delivered Query”...
  • Page 6 TIGER PETHOUSE & RUN - GENERAL ASSEMBLY INSTRUCTIONS Step 1: LAYING THE FLOOR • SINGLE FLOOR - Lay floor down in the desired position. (Detail A1) Step 2: INSTALLING SIDE AND GABLE PANELS • Position blank gable panel and low side panel as shown.
  • Page 7 Please retain instructions for future reference Step 3a: SECURING SIDE AND GABLE PANELS • Locate pre-drilled holes in gable panels. (Detail C1) NOTE: THESE MAY HAVE COVERED OVER DURING PANEL COATING PROCESS. THEY MAY RESEMBLE NAIL HEADS. • Use 4x CB80 per gable, through the pre-drilled holes in each gable, from the outside. (Detail C2) NOTE: ON PETHOUSE WITH RUN, DO NOT SECURE DOOR GABLE WITH CB80.
  • Page 8 TIGER PETHOUSE & RUN - GENERAL ASSEMBLY INSTRUCTIONS Step 3b: SECURING SIDE AND GABLE PANELS • Secure panels to the floor using 2x N65 per panel. Ensure the N65 are driven through the panels and into the floor bearers. (Detail C4) NOTE: PANELS HAVE BEEN REMOVED FOR CLARITY.
  • Page 9 Please retain instructions for future reference Step 4a: INSTALL PET RUN PANELS NOTE: DO NOT REMOVE BLOCKS FROM BASE OF PANELS. • Position longer low blank side and blank gable as shown. (Detail D1) • Secure low side through framing into door gable with 5x N65. (Detail D2) •...
  • Page 10 TIGER PETHOUSE & RUN - GENERAL ASSEMBLY INSTRUCTIONS Step 4b: INSTALL PET RUN PANELS • Position door side to front of Pethouse. (Detail D4) • Secure door side through framing into gables with 5x N65 per panel. • Locate pre-drilled holes in gable panel.
  • Page 11: Roof Panel Installation

    Please retain instructions for future reference Step 5: ROOF PANEL INSTALLATION • Attach roof panels as shown. Ensuring that side with pre-fitted soffit board is to the high side. (Detail E1) • Fix roof to panels using N65 provided though roof boards into upright framing in panels. (Detail E2) NOTE: CHECK OVERHANGS ARE EQUAL AT EACH END AND FRONT TO BACK.
  • Page 12 TIGER PETHOUSE & RUN - GENERAL ASSEMBLY INSTRUCTIONS Step 6a: FELTING THE ROOF - MEASURE AND CUT BEFORE FITTING • Roll felt out onto a clean flat surface 30 minutes before you need it so it has a chance to flatten out.
  • Page 13 Please retain instructions for future reference Step 6b: FELTING THE ROOF - MEASURE AND CUT BEFORE FITTING • Do not fold underneath roof. (Detail F1 & F2) • Once felt is rolled out, fix felt to roof boards using CN13 at each end, making sure the felt is straight. Fix to roof skirting at approx.
  • Page 14 TIGER PETHOUSE & RUN - GENERAL ASSEMBLY INSTRUCTIONS Step 7: FITTING FASCIA BOARDS & FINIAL (BARGEBOARDS) • Fit bargeboards to the roof, trapping overhanging end of the felt in between the roof and bargeboard. • Secure using 2x N40 per bargeboard through roof.
  • Page 15 Please retain instructions for future reference Step 8: FIT CORNER STRIPS AND COVER STRIPS - CERTAIN SIZES ONLY • Secure the corner strips at each corner of the shed with 4x N40 per corner strip. NOTE: THESE CORNER STRIPS MAY NEED CUTTING TO SIZE. NOTE: NOT TO BE CONFUSED WITH WINDOW BEADING.
  • Page 16 TIG/INS65 Display Agent Woodlands DIY Store Station Yard, Horsforth, Leeds, LS18 5NZ Telephone: 0113 205 4189 Website: tigersheds.com Email: customersupport@tigersheds.com...