Download Print this page

Advertisement

Quick Links

TIG/INS59
TIGER
PRESSURE
TREATED
OCTAGONAL
GENERAL ASSEMBLY
INSTRUCTIONS

Advertisement

loading
Need help?

Need help?

Do you have a question about the PRESSURE TREATED OCTAGONAL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Tiger PRESSURE TREATED OCTAGONAL

  • Page 1 TIG/INS59 TIGER PRESSURE TREATED OCTAGONAL GENERAL ASSEMBLY INSTRUCTIONS...
  • Page 2: Before You Get Started

    BEFORE YOU GET STARTED PLEASE READ INSTRUCTIONS CAREFULLY • Check the pack and make sure you have all the parts listed. • When you are ready to start, make sure you have the right tools at hand (not supplied). • Ensure there is plenty of space and a clean dry area for assembly. TIMBER As with all natural materials, timber can be affected during various weather conditions.
  • Page 3 Please retain instructions for future reference CAUTION: CAUTION: All buildings should be erected It is advisable to wear gloves by two competent adults. during building installation. MADE IN THE UK SINCE 1913. We have been making our high quality, great value garden buildings here in Britain for decades.
  • Page 4 BEFORE YOU GET STARTED - PRE ASSEMBLY TOOLS REQUIRED: We recommend using the following tools (not supplied): HAMMER RUBBER MALLET DRILL LADDER TAPE MEASURE SHARP KNIFE SPIRIT LEVEL SCREWDRIVER + WOOD SAW SPANNER FIXING KIT GUIDES: FX06 - NAIL KITS HEAVY DUTY For Heavy Duty Shed Products: CN13 Clout Nails...
  • Page 5 Please retain instructions for future reference • Assembly is straightforward if you follow these step-by-step instructions. • We recommend getting everything aligned properly before screwing together and that screw holes should be pre-drilled to avoid splitting the timber. (Do not come pre-drilled). IMPORTANT •...
  • Page 6 TIGER PRESSURE TREATED OCTAGONAL - GENERAL ASSEMBLY INSTRUCTIONS Step 1: LAYING THE FLOOR • SINGLE FLOOR - Lay floor down in the desired position. (Detail A) Step 2a: INSTALLING SIDE AND GABLE PANELS • Position blank panel along back edge of floor. Offer up panels either side.
  • Page 7 Please retain instructions for future reference Step 3: SECURING SIDE AND GABLE PANELS • Check panels are square by measuring between points shown. (Detail C1) • If measurements are equal, your panels are square. If not, manually adjust to suit. NOTE: DO NOT TRIM.
  • Page 8 TIGER PRESSURE TREATED OCTAGONAL - GENERAL ASSEMBLY INSTRUCTIONS Step 4: FIX CORNER STRIPS • Secure the moulded corner strips at each corner of the shed with 8x N40 per corner strip. NOTE: THESE CORNER STRIPS MAY NEED CUTTING TO SIZE tigersheds.com...
  • Page 9 Please retain instructions for future reference Step 5: INSTALL FIBREGLASS ROOF • Place fibreglass roof in position on top of walls. • Screw 1x CB100 into top rail of each wall panel to secure fibreglass roof. (Detail D) • Secure acorns to top of fibreglass roof from inside using screws provided. •...
  • Page 10 TIGER PRESSURE TREATED OCTAGONAL - GENERAL ASSEMBLY INSTRUCTIONS Step 6: INSTALLING GLAZING • Glaze windows by securing glass/styrene with PP25 supplied, from the inside. (Detail E) NOTE: ALL WINDOWS MUST BE SEALED INSIDE AND OUT WITH SILICONE, PUTTY, OR ANY OTHER WATER-TIGHT SOLUTION.
  • Page 11: Installing Door Handle

    Please retain instructions for future reference Step 7: INSTALLING DOOR HANDLE • Insert the spindle into one of the levers and securely fix the grub screw, ensuring enough of the spindle is free to pass through the door and to be secured in the opposing lever. •...
  • Page 12 TIG/INS59 Display Agent Woodlands DIY Store Station Yard, Horsforth, Leeds, LS18 5NZ Telephone: 0113 205 4189 Website: tigersheds.com Email: customersupport@tigersheds.com...