Samsung AM072BXV Series Service Manual page 140

System air conditioner outdoor unit
Table of Contents

Advertisement

Troubleshooting
4-3 Appropriate Measures for Different Symptom (cont.)
■ IPM [IGBT] breakdown diagnostics (Inverter PBA)
1. Preparations before checking
1) Power Off.
2) IPM failure, discharge mode may not work properly. Therefore, wait more than 15 minutes after the Power Off.
3) Remove all of the Inverter PBA connectors and wire that is fixed as screw.
(Include wire that is fixed to compressor and DC Reactor.)
4) Prepare the digital multi tester.
2. Inspection Method
1) Refer to Figure1 and Table1, respectively the resistance value and diode voltage value measure.
2) According to the criterion in Table 1 to determine whether the failure of IPM.
Division
Measure
the resistance values
Measure the diode
voltage values
Samsung Electronics
Measured Point
+
-
P-IGBT
U
P-IGBT
V
P-IGBT
W
More than
U
N-IGBT
V
N-IGBT
W
N-IGBT
U
P-IGBT
V
P-IGBT
W
P-IGBT
N-IGBT
U
N-IGBT
V
N-IGBT
W
< Table 1 >
Criterion
500 ㏀
Measurement error can occur for reasons such as the
initial measurement condenser discharge.
Measured over at least three times.
0.3~0.7V
Remark
134

Advertisement

Table of Contents
loading

Table of Contents