Installation (Specialists); Instructions On Installation; Installing Ventilation System Nembus 210; Installation Position Ceiling Installation - S&P NEMBUS 210 Manual

Table of Contents

Advertisement

5. INSTALLATION (SPECIALISTS)

CAUTION
The ventilation system may only be installed by qua-
lifi ed specialists, otherwise there is risk of injury or
damages.
CAUTION
In order to protect the system from dirt and humidity,
all openings must be sealed, e.g. using a construc-
tion protector, until commissioning.
NOTE
The following representations of the ventilation sys-
tem are schematic drawings. For all maintenance
tasks, the device is installed immovably on the cei-
ling or wall.

5.1. INSTRUCTIONS ON INSTALLATION

• The ventilation system can be installed on the ceiling
or on the wall.
• As far as construction, the shell must be fi nished and
the entire wall structure of the interior and exterior
walls must be completed.
• During construction, the core drill holes in the exterior wall
for the outdoor air and outgoing air lines must be made.
• The ventilation system can be installed in dry rooms
above +12°C, for example in the utility room.
NOTE
If the temperature in the installation area drops be-
low +12°C, then in individual cases condensate may
form on the device casing.
• The ventilation system is placed so that the outdoor air
and outgoing air lines can be conducted out of the buil-
ding by the shortest path.
• The ventilation system must be installed with noise
coupling.
• The ventilation system must be easily accessible for all
maintenance and repair work. During construction, a
suffi ciently large inspection door must be provided for
this, see page 13.
• Start operation of the ventilation system only after
completion of all installation tasks.
10
5.2. INSTALLING VENTILATION SYSTEM
NEMBUS 210

5.2.1. Installation position ceiling installation

10
>1%
8
9
1
Ventilation system NEMBUS 210
2
Extract ductwork
8
Dry siphon (optional accessory)
9
Condensate duct
10
Outdoor air duct work
14
Supply air duct work

5.2.2. Installation position wall installation

2
1
10
9
1
Ventilation system NEMBUS 210
2
Extract ductwork
9
Condensate duct
10
Outdoor air duct work
14
Supply air duct work
NOTE
The outdoor air and extract air connection must be
always be conected on the bottom in the wall moun-
ted units of the NEMBUS 210 (1).
1
2
M+P-26A-2057
14
M+P-26A-2274
14

Advertisement

Table of Contents
loading

Table of Contents