QUICK START GUIDE
Step 10 - Install Rectifiers and Converters
Slide the unit into the slot
approximately 3/4 of the way

Step 11 - Initial Start Up

1. Verify that all AC, DC and Alarm connections are complete and secure.
2. Turn on AC input breakers.
3. If there are no alarms, make required adjustments to the default settings on the controller for this installation.
Step 12 - Configure Controller per Galaxy Pulsar Edge Controller Quick Start
Guide
Verify and edit controller basic configuration parameters per site engineering instructions.
Information: Rectifier and Converter Options
Rectifier
NE075AC48ATEZ
+24V Orange
1. 480 Vac Line to Line
2. 380 Vac Line to Line
Converter
+24V Orange
3. Maximum current at full load and end of discharge voltage ( 21Vdc or 42Vdc )
Page 4
© 2021 ABB. All rights reserved.
.
Open the faceplate by sliding the
faceplate latch to the left until the
faceplate releases and swings
outward.
Input
Voltage
NE030DC48A
NE040DC48A
NE075DC24A
Slide the unit into the slot until it engages with
the back of the shelf. Swing the faceplate closed
to fully seat the unit. Verify the faceplate is
latched.
Output DC
Recommended AC Breaker
1-Phase
Current
AC3
75A
100A
20A
44A
20A
Input DC
Voltage
Current
81A max
108A max
54A max
3-phase
AC5
AC6 - delta AC7 - wye
25A
20A
40A
20A
Output DC
3
Voltage
Current
25A
1
2
20A
75A
50A
100A