Storage, Installation And Maintenance Checklists - Danfoss EM-PMI300-T310 User Manual

Motor / generator
Hide thumbs Also See for EM-PMI300-T310:
Table of Contents

Advertisement

User Guide
EM-PMI300-T310

Storage, installation and maintenance checklists

Electric machine and customer information
Customer:
Customer reference:
Service reference:
Installation checklist
Approval
General
Electric machine type is correct
Electric machine is
undamaged
Insulation resistance check
>150MΩ
(Reference value of 150 MΩ
must be exceeded at
reference ambient
temperature 25°C (measured
with 500 V
/ 1 min
DC
Megger))
Environmental conditions as
specified (see data sheet)
Mechanical installation
Supporting structure as required
Shaft alignment as specified (see chapter Shaft alignment
and load).
D-end attachment bolt
40 Nm
tightening torque
N-end attachment bolt
30 Nm
tightening torque
Cooling circuit connected
and coolant flowing
Used coolant:
Power connections
Cable gland assembly as specified (cable gland to cables)
with correct cable diameter
Cable lug air cap (to metallic
≥10 mm
structures)
Cable gland tightening
15 Nm
torque (to the box)
Cable lug tightening torque
15 Nm
(to the bus bar)
The phase connections order is correct (U, V, W -> L1, L2,
L3)
Connection box cover bolts
4 Nm
tightening torque
©
Danfoss | April 2023
Electric machine installation checklist
Date:
N.A = Procedure not applicable PASS = Procedure passed FAIL = Procedure failed
N.A
Electric machine type (from the rating plate):
Electric machine serial number:
Date installed:
PASS
FAIL
BC265858156812en-000202 | 63

Advertisement

Table of Contents
loading

Table of Contents