1. Swing the upperstructure so the blade is positioned at
the rear of the counterweight.
2. Fully retract the blade cylinder.
3. Fully extend the boom, arm and bucket cylinders, as
illustrated to the right.
4. Position the boom straight ahead of the upperstructure.
Apply the boom swing pedal lock.
5. Pull the pilot control shut-off lever to the LOCK position.
6. Stop the engine. Remove the key from the key switch.
7. Set a crane in an appropriate position.
8. Attach shackles to the boom and blade hooks. Securely
thread wire ropes through the shackles.
9. Slowly lift the machine so that shock loads will not be
applied to the machine. Take sufficient care not to lose
the balance of the machine.
TRANSPORTING
ZX30U-5N: 2000 mm (79 in)
ZX35U-5N: 2000 mm (79 in)
ZX50U-5N: 1700 mm (67 in)
ZX60USB-5N: 1300 mm (51 in)
6-8
ZX30U-5N: 4200 mm (165 in)
ZX35U-5N: 4200 mm (165 in)
ZX50U-5N: 4100 mm (161 in)
ZX60USB-5N: 3900 mm (154 in)