X-CALIBUR ENGAGEMENT BOX ASSEMBLY REMOVAL & INSTALLATION
N
G
In the event of a fall or any damage to Engagement Box Assembly
Engagement Box Assembly must be replaced before returning the unit to service.
L
I
STEP 1
Remove the front Lifting Point (7) and Universal Weight (6)
S
H
STEP 2
Remove the six 3/8-16 x 1" Flange Head Screws (12)
STEP 3
Remove the
X-CALIBUR
STEP 4
Return the damaged Engagement Box Assembly to Leading Edge Safety:
Leading Edge Safety, LLC
1400 Taney St
North Kansas City, MO 64116
888-990-2990
STEP 5
Install new
X-CALIBUR
shown above.
STEP 6
Secure the Engagement Box Assembly with six 3/8-16 x 1" Flange Head Screws (12)
Once the new
fasteners are all properly installed, the
X-C
ALIBUR
Engagement Box Assembly
Engagement Box Assembly with Fall Arrest Tie Off Ring facing away from the rear tires as
X-CALIBUR
Engagement Box Assembly, Universal Weight, Lifting Point, and associated
X-CALIBUR
I
M
NSTRUCTION
APPENDIX A—
(XEBA-000-23)
12
may be returned to service for fall arrest applications.