NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Installation Instruction document.
I. PRELIMINARY INFORMATION
MODEL NO. ____________________________________________
JOB NAME _____________________________________________
SERIAL NO. ____________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit (Y/N) _____
Verify installation of outdoor-air hood (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor-air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat (Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage
Compressor Amps 1
Compressor Amps 2
Supply Fan Amps
TEMPERATURES
Outdoor-Air Temperature
Return-Air Temperature
Cooling Supply Air Temperature
PRESSURES
Refrigerant Suction
Refrigerant Discharge
Verify Refrigerant Charge using Charging Charts (Y/N) _____
GENERAL
Economizer minimum vent and changeover settings to job requirements (if equipped) (Y/N) _____
Verify smoke detector unit shutdown by utilizing magnet test (Y/N) _____
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53500213-01
UNIT START-UP CHECKLIST
(Remove and use for job file)
L1-L2_____________
L1 _____________
L1 _____________
L1 _____________
_____________ °F DB (Dry Bulb)
_____________ °F DB
_____________ °F
CIRCUIT A _____________ PSIG
CIRCUIT B _____________ PSIG
CIRCUIT A _____________ PSIG
CIRCUIT B _____________ PSIG
Printed in U.S.A.
Form 50KCQ-4-6-02SI Rev. A
L2-L3_____________
L2 _____________
L2 _____________
L2 _____________
_____________ °F Wb (Wet Bulb)
Pg CL-1
11-19
L3-L1_____________
L3 _____________
L3 _____________
L3 _____________
Replaces: 50KCQ-4-6-01SI

Advertisement

Table of Contents
loading

Table of Contents