JLG 1930ES Operation And Safety Manual page 94

Table of Contents

Advertisement

SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE
3. The tightening of the nuts should be done in stages. Fol-
lowing the recommended sequence, tighten nuts per
wheel torque.
Table 6-11. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage
2nd Stage
20-30 ft lbs (28 - 42 Nm) 65-80 ft lbs (91 - 112 Nm) 105 -120 ft lbs (142 - 163 Nm)
6-16
4. Wheel nuts should be torqued after the first 50 hours of
3rd Stage
– JLG Lift –
operation and after each wheel removal. Check torque
every 3 months or 150 hours of operation.
3121165

Advertisement

Table of Contents
loading

This manual is also suitable for:

2030es2630es2646es3246es

Table of Contents