AKINA HEADBOARD
Assembly Instructions
TOOLS REQUIRED BUT NOT INCLUDED:
Electronic stud finder, Phillips screwdriver, Drill, Pencil
WARNINGS:
Do not throw away packing materials and carton until after
assembly. Assemble all parts on a clean surface.
This hanging system is meant for dry wall/stud mounting only.
If walls are concrete, brick are plaster, please consult your local
hardware store for assistance. For safety and ease of
mounting, use two people. Professional installation is
recommended.
CARE INSTRUCTION:
Avoid direct exposure to sunlight. Do not place overheat or air
conditioning vents. Adjust levelers so that the furniture sits flat on
uneven floors.
Do not rub blot spills. Clean with a dry white cloth.
Do not use harsh chemicals.
Before cleaning any part test a small spot in a hidden area.
You may need to re-tighten all bolts after initial use.
PARTS INCLUDED
(A) HANGMAN
x1
I IC) I I
(D) BUBBLE LEVEL
x1
EXCLUSIVE AND CONFIDENTIAL PROPERTY OF URBAN OUTFITTERS, INC.
© 2017 UO, Inc. All rights reserved, including all applicable copyright, design and patent
rights. Any unauthorized reproduction, adaptation, distribution or other infringement will be
prosecuted.
��----.----r
(B) STUD MOUNTING SCREW
x17
URBAN OUTFITTERS
�
(C) PLASTIC ANCHOR
x17
Page 1 of 2
Need help?
Do you have a question about the AKINA 81201667 and is the answer not in the manual?
Questions and answers