ABB ReliaGear ASPMETER A 42 Installation And Commissioning Instructions page 7

Lighting panelboards - branch circuit monitoring

Advertisement

A S P M E T E R S O L I D C O R E
ASPMETER solid core
Data output
Monitoring at mains
Current per phase
Max. current per phase
Current demand per phase
Max. current demand per phase
Current phase angle
Energy (kWh) per phase
Real power (kW) per phase
Apparent power (kVA)
Power factor total *
Power factor per phase
Voltage — L-L and average
Voltage — L-N and average
Frequency (phase A)
Monitoring at branch circuit
Current
Max. current
Current demand
Max. current demand
Current phase angle
Real power (kW)
Real power (kW) demand
Real power (kW) demand max.
Energy (kWh) per circuit
Power factor
Apparent power (kVA)
Modbus alarms
Voltage over/under
Current over/under
* Based on a 3-phase breaker rotation.
ASPMETERA
ASPMETERB
ASPMETERC
Blink code
Color and pattern
Green, once per second
Amber, once per second
Amber, twice per second
Amber, three per second
Red, solid or blink
Commissioning
1. Install according to instructions in mechanical installation.
2. Provide control power to main circuit board.
3. Configure installation mode using Modbus register 6.
4. Configure CT scaling.
5. Configure alarms.
6. Configure demand.
Download the free configuration tool "NetConfig" from
www.veris.com/modbus_downloads.aspx to commission
the ASPMETER for operation.
7
Status description
Normal operation
Volts or amps clipping
Invalid firmware image
Incorrect strips or strip order
Device failure