4-3-2.
Installation of Front Ornament
1.
While installing the two bosses and the claw, install the Front Ornament.
Boss
2.
While installing the two bosses, install the Sheet Metal D and tighten two screws.
Tightening torque = 0.12 ± 0.02N · m (1.2 ± 0.2kg f · cm)
P
T O
Bosses
HDR-CX620/HDR-CX670/HDR-PJ620/HDR-PJ670
T O
P
Front Ornament
Boss
Claw
Sheet Metal D
Screws
4-32