7.
Stick the Adhesive Part of the Motor A Flexible Board while matching it with the two bosses. If the adhesive force
is lowered, cut the Adhesive Sheet as shown in the figure in the frame and then stick it.
Adhesive part
P
T O
8.
Install the Frame (E-SUB-A), Frame (E-SUB-B), and Ball Bearing while matching the six bosses and the shaft with
the holes, and then tighten six screws in the order as shown in the figure below.
P
T O
Screws
SHEET METAL (B)
(0020A)
Bosses
Frame (E-SUB-B)
HDR-CX620/HDR-CX670/HDR-PJ620/HDR-PJ670
Bosses
Flexible Board of
the Motor A
Shape and sticking position
of Adhesive Sheet
Adhesive part
Flexible Board of
the Motor A
Bosses
Frame (E-SUB-A),
Ball Bearing
Shaft
Bosses
Screws
Screws
4-36