7 Equipment Commissioning

7.1 Check Before Power ON

No.
The product is firmly installed at a clean place that is well-ventilated and easy to
1
operate.
The PE, DC input, AC output, and communication cables are connected correctly and
2
securely.
3
Cable ties are intact, routed properly and evenly.
4
Unused ports and terminals are sealed.
The voltage and frequency at the connection point meet the inverter grid connection
5
requirements.

7.2 Power On

Step 1 Turn on the AC switch between the inverter and the utility grid.
Step 2 Turn on the DC switch of the inverter.
PV
Inverter
DC Isolator
(Optional)
For Australia only.
Equipment Commissioning
Check Item
AC Breaker
Turn on
Turn off
27
Grid
Power ON
1
3
Power OFF
4
1
2
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gep3.6-1-10Gep4.2-1-10Gep4.6-1-10Gep5.0-1-10

Table of Contents