10. Trial Run
1. Conduct the test run only after all installation tasks have been completed.
2. Check the following items during the test run.
◼ Indoor and outdoor units are properly installed.
◼ Piping length, and the amount of refrigerant charged have been recorded.
◼ Piping and wiring are correct.
◼ The voltage of the power supply is the same as the rated voltage of the air conditioner.
◼ No leakage from the refrigerant piping system.
◼ There is no obstacle at the air inlet and outlet of the IDUs and ODU.