Controller Operation At Work - Mains MV4k/1 Instructions Manual

Checkout controller
Table of Contents

Advertisement

Controller MV4K - handling
Turn on the controller:
1. Release the safety button [4], by turning it to the right..
2. Switch the main switch [5] in the upper posiotion, the permit button LED blinks,
at the same time circuit of the lamp 2 is turned on.
Turn on a conveyor belt in automatic mode:
Press the button number [1], the LED lights up. In this mode, the first belt works automatically with the use of photocells.
To start the conveyor belt for the first time overshadow the photocell with any object or press the foot pedal.
If during the work the photocell is obscured by any object, the conveyor stops automatically and it will start again after removing
the object from the photocell line-of-sight contact.
In case of shaded photocell (or in case of lack of signal from it), it is possible to move the conveyor using the footswitch.
If the conveyor belt is running empty for about 12 seconds and nothing will overshadow the photocell, the controller will stop it automatically.
The second belt works automatically and moves according to the first belt, but its operating time is extended for about 2 seconds.
MAINS S.C. E.M.Wosińscy Brzeziny 95-060 ul. Słowackiego 12, tel/fax: 48 46 8752 777 www.mains.pl; mains@mains.pl
Digital programmable belt controller
Digital programmable belt controller
Digital programmable belt controller
SERVICE
S. START
2
OUT
CTRL
POWER
POWER
SERVICE
S. START
2
OUT
CTRL
POWER
POWER
SERVICE
S. START
2
OUT
CTRL
POWER
POWER
Handling
Mv4k
Mv4k
Mv4k
controller: Mv4k
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mv4k/2

Table of Contents