Northern Telecom QCA146 Installation And Testing Instructions page 17

2-mb/s remote peripheral equipment cabinet and shelf
Hide thumbs Also See for QCA146:
Table of Contents

Advertisement

3-8
Installation
F i g u r e 3 - 2
Typical terminal block layout
2-Mb/s Remote Peripheral Equipment
BIX Blocks
For Base Cabinet
Cable A
Cable B
To PE Shelf
To PE Shelf
Cable C
Position 2
Position 1
In First
In Second
Cable D
Tier Of
Tier Of
Cabinet
Cabinet
Cable E
Cable F
Cable G
Cable PFJ1
To PE Shelf
To PFTU
Position 3
Cable P10
In Second
To QUX19 Unit
Tier Of
Multipling Connectors
Cabinet
Wiring and Cables
to CO Trunks
Wiring
and
Cables
to
Telephones
(Ill553-1143)
Appendix 1 to 553-2741-200
BIX Blocks
BIX Blocks
For First Expansion
For Second Expansion
PE Shelf
PE Shelf
Cable A
Cable A
Cable B
Cable B
To PE Shelf
Cable C
Position 4
Cable C
In Third
Cable D
Cable D
Tier Of
Cabinet
Cable E
Cable E
Cable F
Cable F
Cable A
Cable A
Cable B
To PE Shelf
Cable B
Position 5
Cable C
Cable C
In Third
Tier Of
Cable D
Cable D
Cabinet
Cable E
Cable E
Cable F
Cable F
Multipling Connectors
Multipling Connectors
Wiring
Wiring
and
and
Cables
Cables
to
to
Telephones
Telephones

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QCA146 and is the answer not in the manual?

This manual is also suitable for:

Qsd74Sl-1

Table of Contents