Northern Telecom QCA146 Installation And Testing Instructions page 12

2-mb/s remote peripheral equipment cabinet and shelf
Hide thumbs Also See for QCA146:
Table of Contents

Advertisement

Installation
3-3
14
Measure the resistance between the system ground wire and the
ground lug at the rear of the cabinet (Figure 2-1). If the
resistance is greater than 5
, check the building ground and ac
panel connections.
—continued—
2-Mb/s Remote Peripheral Equipment
Appendix 1 to 553-2741-200

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QCA146 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Qsd74Sl-1

Table of Contents